Showing posts with label P4 standards. Show all posts
Showing posts with label P4 standards. Show all posts

Monday, 23 November 2009

Do you tin?


I've just spend a pleasant five minutes tinning the tops of all my rivets in my turnout sleepers
:-)

It may have been completely unnecessary (or it may not...) but it seemed that it helps speed the formation of the solder joint.

I've never done it before but it was rather therapeutic - just a pinhead of 188 solder cream and a wipe of the iron. Alas, two days away on business in Amsterdam mean that it will be the end of the week before I get a chance to do any more. Still, I have the 1:4 vee filed up and fitted now. One more decent session, as opposed to snatching a quick ten minutes at the end of the evening, and this thing will be built!

Riveting stuff

I had some time free on Sunday afternoon, so I thought that I would gather the tools together to turn my miscellaneous crossing timbers into something that I could construct a turnout from. First, gather the tools...



I used to have a lovely solid aluminium sawing block - the type that you clamp to the edge of a workbench - that was great for peening rivets over on. Sadly, that has disappeared in the mists of time, so i had to look for an alternative. That's the very solid block of steel making up that set square, so that will do nicely. It's propped up on the end of my soldering sponge just so that it is level.

For actually turning over the tubular rivets, of which a few can be seen in the foreground, by using the centre punch on the left. I use it unconventionally, by turning it upside down and tapping (okay, belting it quite hard..) on the pointy end with the small hammer on the right. It usually needs three or four taps to get the back of the rivet level with the sleeper, and then it's closed for good.

The most problematic bit that I found was getting the rivets into the holes in the sleepers. I had problems lining them up in the first few sleepers, and then I snapped one by mis-aligning the rivet with the hole and pressing too hard. So after that, I just reamed slightly out the holes so that they slipped in more easily. But it just shows that even on the simplest tasks it's possible to make mistakes.

I had a second template stuck down with double-sided tape, with more tape on the front to hold just the ends of the sleeper. After each sleeper was riveted, I transferred it to the appropriate position on the second template.



And after they were all in place, I dug in the spares box for some rail parts that I could recycle to save making them again. I found a pair of point blades, and a pair of wing rails.



Some work with a fibreglass brush and they'll be ready to use again. But first I need to make the 1:4 angle vee, as that is the part from which I remember that the pointwork is built from. I really should dig out the Scalefour Society Digest sheet on building turnouts, rather than trying to do it all from memory ;-)

Saturday, 14 November 2009

Sleeper spacings

Two separate days on business in Amsterdam this week, and an evening seminar in between means that there has been precious little time available for any modelling. However I managed to find a quick ten minutes last night to knock up a quick jig that will help with future jobs.

The period that I'm going to be modelling is Great Eastern Railway, circa 1909/10. The exact date hasn't yet been fixed, but it will be around then. Thanks to Adrian Marks on the Templot forum, I have plenty of information on the different types of track formation that would have been used.

At this date, the quieter branchlines of the GER would still have been laid with rail in lengths of 30 feet, if not even the earlier 24' length. A standard was established in 1883 (rather than 18.83!) set that there would be eleven sleepers per thirty foot section.

I am knocking up a quick piece of board in order to sit rolling stock on to check buffer height, coupling alignment, etc, etc. This is just on a small offcut of wood pinched from the back of the garage. It's conveniently long enough to fit two 30' legths of plain track on it, and next to it I can put an A4 turnout that will be a test to see how stock runs over pointwork and crossings, and will be a good proxy for some of the more severe curves that will be found within the to-be-built brewery.

Adrian provided a set of measurements for the sleeper spacing of this rail length, so I printed off his diagram, and then transcribed the markings at 4mm to the foot on the side of a piece of stout card.


This was then placed next to the length of track that had already been prepared with
separated C&L sleepers taken from the individual P4 trackbase panels. These work very well on their own, but they don't simulate the variable spacing around rail joints and the large gaps between sleepers that I wanted to capture.

The spacing marks on the card could then be easily aligned with the centre of the chair on the outside of the rail for each sleeper.


A bit of shuffling around, and we have one prototypically spaced length of GER track. The railhead is notched with a piercing saw to simulate the gap between the railends, and I'll add an etched brass fishplate to the join afterwards.


I'll now attempt not to nudge the sleepers out of position (being separated from each other means that they do move more easily out of alignment) and when all is square I'll glue it down to my bit of nicely varnished board.

Thursday, 5 November 2009

Hoorah for Alan Gibson!

I had a call on Saturday from Colin at Alan Gibson saying that he had an order for me ready for shipping. On Tuesday I had a card through the door saying that the Royal Mail had a package for me to sign for, And finally today, I was able to go down to the post office and collect a stout brown box with my name on...

And inside were :-)

I haven't opened the boxes yet, but they should both have a full complement of P4 wheels included, and be ready for full springing on all axles. Excitement!

Saturday, 8 August 2009

Paranoid? Moi?

We've all heard occasional stories of tyres becoming detached from wheel rims in use. Less frequently discussed, but probably more prevalent is the chance of a wheelset moving around on an axle during use. Well, I've decided that I'll try and eliminate that risk.

So after double checking each wheelset with a Scalefour Society gauge, I'm applying a tiny smear of superglue to the join between the back of the spokes and the axle. Hopefully that means that they will stay set in place, and one more variable that can cause problems with consistent running is removed.